1. Stacker crane operators should have received training in safety technology and operation and maintenance technology, and other personnel are not allowed to operate privately.2. Non-operators are strictly prohibited from touching and arbitrarily triggering the operation switch on the operation pan
2023.08.30
Read MoreThe planning and design process of shuttle ASRS is very complex and rigorous, not only to meet the design index requirements such as strength, stiffness and stability of shuttle ASRS shelf structure, but also to ensure the performance and operation reliability of the soft control system configuratio
2023.07.05
Read MoreAutomated three-dimensional warehouse with shuttle, multi-layer shuttle, four-way shuttle, hoist, stacker, conveyor and other equipment direct cooperation, the overall work efficiency of the warehouse is greatly improved, then, what are the advantages of these equipment?Core functions of the shuttle
2022.12.28
Read MoreEBILTECH Xiamen automatic three-dimensional warehouse project is being installed, shelf type shelves with stacker and conveyor, can store a largenumber of standardized small weight goods, greatly improve warehouse space utilization, in height Direction is more optimized for utilization. Avoidheavy o
2022.11.25
Read More